Rail-aligned leaf switches

  • Build
  • Fabric 08
  • Datacenter

Difficulty 4 of 5

64 H100 in 8 servers: tensor parallel inside each server, data parallel 8 across them. The board has two cabling plans: one leaf switch per rail or one per server. Keep one plan and the spines you need. A step must take under 3.1 s, within 132,000 USD/mo.

Play level

Data centerHostHostHostHostHostHostHostHost
The board at the start of the level
A full batch keeps each GPU busyArrow keys change the GPUs. Tap or Space changes the batch

2 GPUs · batch 64 · job 1.5 h · 2.1 USD

Goals and limits

p50 latency
under 3.1 s
Monthly cost
under 132,000 USD/mo

Concepts

How players did

Player results load from the server.